Bidding announcement of high pressure gate valve o

2022-09-19
  • Detail

Puguang company high pressure gate valve bidding announcement

Sinopec International Co., Ltd. is entrusted to conduct public bidding for the high pressure valve required by G Puguang high pressure valve. It is announced today that eligible bidders are invited to sign up. 1. Bidding No.: wza/b--b12 Project content: G Puguang high pressure valve project overview: Project

Sinopec International Co., Ltd. is entrusted to conduct public bidding for the high pressure valve required by G Puguang high pressure valve. It is announced today that eligible bidders are invited to sign up

1. Bidding No.: wza/b--b1

2 Project content: G Puguang high pressure valve

Project Overview: the project has been approved and the fund has been implemented

3. Name and quantity of bidding materials:

4 Delivery date and place: August 30, 2019, on site

5 Other qualification requirements: 1 The bidder shall provide HIC and SSC test reports of A350 LF2 or a352 LCB or a352 LCC materials 2 The bidder has the supply performance of at least one nickel base gate valve with breakthrough size (PN ≥ cl900, DN ≥ 150) related to the technology and industrialized utilization of new materials not less than the nominal pressure and nominal frontier of the project under sour gas conditions, and has operated for at least 1 year (subject to the delivery date of the contract). The bidder must provide a copy of the valve supply contract to prove that the performance provided meets the requirements of this bidding. Failure to provide the above information is invalid performance. If such performance cannot be clearly proved in the contract, technical agreement or technical requirements shall also be provided. 3 The bidder holds API6D, api607 or api6fa certification of gate valves within the validity period, and the fire prevention certificate shall cover the nominal pressure, nominal diameter and structural type of gate valves in this project. 4. Provide the special equipment manufacturing license and type test certificate of the gate valve within the validity period, and the type test certificate is often used in terms of category, pressure level and diameter. The third test method can cover the bidding materials. 5 Hold ISO9001 quality management system certification, ISO14001 environmental management system certification and OHSAS18001 occupational health and safety management system certification within the period of validity, or equivalent system certification. And the scope of certification covers valve manufacturing

6. Cost of bidding documents: the cost of bidding documents is 1000.00 yuan. The sliding friction between objects when there is relative sliding is called dynamic friction. The bidding documents are non refundable after sales

7. time of sale of bidding documents: from 8:00 on June 12, 2019 to 16:00 on June 18, 2019 (Beijing time, the same below)

8. selling method of bidding documents: the bidding documents are purchased on the Internet. The applicant registers on the electronic bidding and tendering trading platform for Sinopec materials () and fills in the basic information (the basic information includes business license, tax registration certificate, organization code certificate, etc.), After passing the basic information review, obtain the user name and password and log in to the platform (if there is a user name and password on the Sinopec materials E-bidding trading platform or the Sinopec materials procurement e-commerce platform, you can log in directly). After paying the cost of the bidding documents, download and adjust the spacing by relying on the movement of the console to connect the bidding documents at the control desk

9. place of submission of tender documents: upload encrypted electronic tender documents to the electronic bidding and tendering trading platform of Sinopec materials. The unencrypted electronic tender document shall be stored in a USB flash disk, sealed separately with an envelope, and submitted together with the paper version of the tender document to the place of bid opening: the bidding Hall of Sinopec International Co., Ltd. Nanjing bidding Center, floor 6, Jincheng building, No. 216 Longpan Middle Road, Qinhuai District, Nanjing. Among them, electronic bidding documents are produced by Sinopec electronic bidding document production tool. After production, the production tool automatically generates encrypted electronic bidding documents and unencrypted electronic bidding documents. The paper version of the bidding documents is the written printed version of the electronic bidding documents (the first page of the paper version of the bidding documents is stamped with the company's official seal)

10. deadline for bidding: 09:00 on July 5, 2019

11. time of bid opening: 09:00 on July 5, 2019

place of bid opening: the bidding Hall of Sinopec International Co., Ltd. Nanjing bidding Center, 6th floor, Jincheng building, No. 216, Longpan Middle Road, Qinhuai District, Nanjing. The bid documents mailed will not be accepted

12. Media of announcement: this announcement is issued simultaneously on China procurement and bidding, Sinopec materials E-bidding trading platform (), and Sinopec materials procurement e-commerce platform (), and the amendments and supplements of this announcement are issued simultaneously on the above media

13. for any inquiry about this bidding, please contact sun Xiao before 09:00 on July 5, 2019, and for technical consultation, please contact Wang Geng (for technical inquiry, please contact by letter or fax)

14. other important requirements: none

15. bidding instructions: (1) the bidding fee must be paid on the e-commerce platform of Sinopec material procurement, and the name of the bidder's unit shall be invoiced. (2) If the bidding project contains the word "(re bidding)", it is a re bidding project. Bidders who have participated in the first bidding can be exempted from paying the bid fee of re bidding. They can download the bid directly, and the system will pop up a prompt to the supplier that there is no need to pay the bid fee for re bidding. (3) Please inquire or about the fee payment system. Please inquire about the download of bidding documents and other system operations, station pages and other issues. (4) If the bidder abandons the bid after purchasing the bid, it is required to send the "Declaration of abandonment of bid" stamped with the official seal to the contact mailbox of the bidding Center 5 days before the bid opening time

16. contact information:

bidding consultation:

contact person: Sun Xiao

phone:

email: wzsunx@

technical consultation:

contact person: Wang Geng

phone:

email:

Sinopec International Co., Ltd

Copyright © 2011 JIN SHI